Rivers Lodge

Complete Mechanical Refurbishment Installation of a New Condensing Boiler Heating Supply split up into 4 Separate Circuits Installation of Column Radiators Throughout Toilet and Kitchen Provisions Installed Ventilation operated via motion sensors in W/C’s

Priory Point

Large Diameter welded steel Gas pipe at high level 6 new large Gas heaters installed New Solenoid Valve 2 New gas boosters fitted Dedicated controls for each heater

Church Lane Community Centre

Site refurbishment required existing services to be re-routed. Installation of a gas fired water heater. Installation was a sealed system with the inclusion of expansion. New dedicated control panel installed to control the new services.

Aircraft Research Association (ARA)

Existing pipework and boiler layout in the plant room Removed. 3 new Boilers installed on the original base. New pipework configuration connecting to existing pipework outside of plant room to distribute throughout building. New stainless steel sectional Flue installed following the original route used. A new Control Panel was installed to run the new equipment.

St. Michael’s Church, St. Albans

Complete Mechanical Refurbishment Installation of 2 new condensing boilers Heating split up into 11 different circuits Installation of Fan convectors and radiators throughout Ventilation installation to toilet operated by a PIR