- Location:
- Kempston Pool, Bedford
- Existing Plant room Services Removed.
- Pool remained in operation throughout the job via a temporary plant room.
- New installation connected onto existing services to distribute throughout building.
- Installation of 6 new condensing boilers.
- New controls setup to allow 5 boilers to run at once, leaving one in standby.
- New pumps, air dirt separator and pressurization unit installed.